Create Risk Register for a Project Management in an International Environment (Brazil)

Create Risk Register for a Newbusiness similar to Lowes or Home Depot to be located in Brazil.

 

Create the Risk Register  – Instructions, Project Description, and Learning Topics are included (required to add in the report as citations & references).

 

In this step, your team will develop a project riskregister using the provided risk register template. The risk register mustinclude at least 10 project risks, both internal and external, as well as theprojected response or responses to those risks. Keep in mind that you areconducting a project in a foreign country, Brazil, which itself will addsome risk because the official language in Brazil is Portuguese.

 

The report should be 2 pages, excluding cover page, executivesummary, reference list, and appendices(required). Any tables, graphs, and figures should beincluded as appendices. Your report should have one-inch margins and be doublespaced in 12-point Times New Roman font. In-text citations and referencesshould abide by APA 7 format.

 

Risk is a factor in every project. Each stakeholderand each element in your work breakdown structure, especially along thecritical path, introduces risk. Identifying and managing these risks iscritical to ensuring project success. Read more in Project Risk and RiskRegister.

 

Instructions for references and citationsto be included from the learning topics:

Examples of the learningtopic references should be as follows:

University ofMaryland Global Campus. (2022). Learning Topic: Shared and DistributedLeadership. Retrieved from:  https://leocontent.umgc.edu/content/scor/uncurated/mba/2218-mba670/learning-topic-list/shared-and-distributedleadership.html

University ofMaryland Global Campus. (2022). Learning Topic: Strategic Leadership. Retrievedfrom: https://leocontent.umgc.edu/content/scor/uncurated/mba/2218-mba670/learning-topic-list/strategic-leadership.html

Example of Citation should be: (Strategic Leadership, UMGC, 2022)


Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more